
Add to Cart
Hard Alloy High Precision Metal Stamping Mold Tooling Block For Stamping Mold Punch
BG provides customers with high-precision, low-cost mould parts. For example mould cores, inserts, sliders, lifter, wear plates, ejector pins, etc. Usually, processing accuracy can be controlled within + /-0.015mm. Delivery time is 2-3 weeks, DHL or FedEx will take about 3 days for shipping.
All the steel and tolerances of the parts are processed according to the drawings of the customers.
If you have some questions about plastic moulds, or want to know more about auto mould parts, medical mould parts, packaging mould parts, cosmetic mould parts, connector mould parts etc. Welcome to contact us!
Factory | Dong Guan BG Precision Mold Parts Co.Ltd |
Material | Steel:HSS , ASP23,Carbon steel, ASSAB Steel, 1.2379, Q235, 1.2842, C45# etc. |
Stainless Steel: 303 / 304 / 316 / 416 / etc. | |
Aluminum: AL7075,AL6061,AL5052 etc. | |
Titanium: Grades 1-4 Grade 5 Grade 9 etc. | |
Tungsten Carbide:YG6, YG6X, YG8, YG8x, YG8A, YG8N, YG10, YG13X, YG13, YG15X, YG15, YG18X, YG18, YG20 etc. | |
Brass,Copper,Bronze etc. | |
Plastic: ABS, PC, PE, POM, Delrin, Nylon, Teflon, PP,PEI, Peek etc. | |
Surface treatment | Polishing, Sandblasted,Anodizing, Chrome plating, Zinc plating, Nickel plating, Laser engraving, PVD coating etc. |
Our Equipments | 6 sets CNC Machining Center, 4 sets CNC AUTO Lathe Machine, 4 sets CNC Milling Machine,4 sets Drilling Machine, 8 sets Grinding Machine, 4 sets EDM Wire Cutting etc. |
Inspection Equipment | 2 sets Japan Projector, 1 set Microscope, 2 sets 2D Projection, 4 sets Height gauge, 8 sets Micrometers, 6 sets vernier caliper, 10 pcs Plug Thread Gages, 10 pcs Ring Thread Gages etc. |
Accuracy | Accuracy Of Machining:+/-0.005mm, Accuracy Of Grinding:+/-0.005mm,Surface Roughness:Ra0.4,Parallelism:0.01mm,Verticality:0.01mm Concentricity:0.01mm |
Surface Roughness | Ra0.1-Ra3.2/ Also can be customized |
Lead Time Guarantee | Sampling: 7-10 workdays Normal making: 10-12 workdays Complex design/making: 15-20 workdays |
Quality control | Strictly IQC---PQC---OQC |
1. Competitive price: | based on reasonable calculation, our price is always competitive which can help customers win at the first round of competition |
2, Consistent quality control: | parts are made by our experienced staffs that can control the parts to exact dimensions in the process of production. On the other hand, our experienced QCs inspect all the parts thoroughly which can ensure 100% high quality products sent to you! |
3,Quick delivery time: | it depends on order Qty and index of process, usually we can ensure you 5days delivery |
4,Made-to-order service available: | make special parts which depends on customers detailed requirements! |
5,Excellent customer support: | before sales service-in sales-after sales service are available, pls feel free to contact us at anytime! |
BG has strict quality control system from the raw material incoming to finished products outgoing. Our mould parts are guaranteed high precision,high polished and long service life.
Below are our main quality inspection items in the whole production process:
(1) Q: Can I have a sample order before order?
A: Yes, we welcome sample order to test and check quality. Mixed samples are acceptable.but you should pay sample charges.
(2) Q:Do you have any MOQ limit for led light order?
A: Low MOQ, 1pc for sample checking is available.
(3) Q:How do I pay for the order?
A.The common payments are T/T(Telegraphic Transfer),Paypal.
(4) Q: I have an idea for a new product, but don't know if it can be manufactured. Can you help?
A. Yes! We are always happy to work with potential customers to evaluate the technical feasibility of your idea or design and we can advise on materials, tooling and likely set-up costs.
(5) Q:What type of material is best for my design/component?
A. Materials selection depends on the application of your design and the environment in which it will function. We will be happy to discuss the alternatives and suggest the best material.
(6) Q:. What about the lead time?
A: Normally it’ll take 3-5 days for Sample preparing ,8-10 working days for mass production. but it also depend on your request and order quantity.
(7) Q:How to proceed an order for mould parts?
A: Firstly let us know your requirements or application.
Secondly We quote according to your requirements or our suggestions.
Thirdly customer confirms the samples and paid the deposit for formal order.
Fourthly We arrange the production.
(8) Q:Before Shipment How To Make Sure The Plastic Mould Parts Quality?
A: You can come to our factory or let the third party for inspection, if not, we will be as your inspection worker. we will share you a video for production process details.
(9) Q: How do you ship the goods and how long does it take to arrive?
A: Ship by DHL, UPS, FedEx or TNT. It takes 3-5 days to arrive. Airline and sea shipping also optional. Or you can provide your forworder’s information,we can contact with them to arrange the shipment.
(10) Q:What will you do after sales?
A:We have after-sales servise, when you received our products,we will follow up and await your feedback.
Any question related to our products,our experienced engineers are always here for backup.
If you are interested, please do not hesitate to contact with us! Thank you!